Construction
March 19, 2008
Phase 111. Interior wall installation. Looking Southeast. |
Phase 111. Floor slab preparation for electrical conduit. Looking Southwest. |
Phase 111. MEPF rough in . Looking Northeast. |
Phase 111. Interior wall contamination remediation area. Looking Northeast.. |
About the Library | ©2006 Neuse Regional Library 510 North Queen St. Kinston, NC 28501 (252) 527-7066 Fax (252) 527-9235 nrl@neuselibrary.org
Updated:
July 14, 2008