Construction
March 26, 2008
Phase 111. Exterior window replacement in East elevation. Looking North. |
Phase 111. Metal stud and electrical in wall rough in. Looking Southeast. |
Phase 111. MEPF rough in . Looking Northeast. |
Phase 111. MEPF rough in. Looking East. |
About the Library | ©2006 Neuse Regional Library 510 North Queen St. Kinston, NC 28501 (252) 527-7066 Fax (252) 527-9235 nrl@neuselibrary.org
Updated:
July 14, 2008